Tubosider chamber system

The certified integral lifting ring on our chambers makes installation and maintenance easier than ever.

Unique lifting design

Our new range of chambers can be lifted entirely into an excavation. This unique design includes an integral lifting ring with incorporated slinging points. The lifting ring is designed to remain attached to the chamber so installation is less labour intensive, faster and more cost-effective than other chamber designs. Available in 1.2m diameter as well as other sizes on request, the chambers are designed to optimise ease of access for future maintenance of the drainage system.

tubo-61-02
tubosideraug-172

They’re fabricated to order in our factory, from galvanised steel and delivered to site ready to install. An easy-to-follow WRc accredited installation guide helps save even more time and resource.

The chamber design was developed by Tubosider’s design team to meet market demand, after talking to customers and recognising some of the everyday challenges that access chambers and manhole present.

Enquire about access chambers Download pdf

Key features

All our tanks and chambers come with access points, ladders and shafts as required.

  • Easy to install

    WRc approved installation instructions

  • Unique design

    Secure integral lifting ring with incorporated slinging points

  • Low cost

    Reduces cost and time burden of inspection and maintenance

  • Made to order

    Fully fabricated and delivered ready to install

Typical applications

Our chamber design is suitable for many different underground drainage applications including:

We pride ourselves on our value engineering. This is a great example of how our design team have understood what our customers are looking for and responded. Call us to discuss your requirements, prices are available on request.

Related