Inverclyde Council

Background to specification
Tubosider UK’s rainwater storage and harvesting system for Inverclyde Council’s new £44 million Shared Campus in Port Glasgow sees a new development in the use of its stormwater tanks, one specially designed for Scottish requirements.

The Slaemuir complex constructed by GRAHAM Construction will become the new home for Port Glasgow High School and St Stephen’s High School as well as a new Additional Support Needs (ASN) School to replace Glenburn and Lilybank schools.

The project is designed by a multi-disciplinary team led by Ingenium Archial Ltd as architects and lead consultant, working among others with Buro Happold as mechanical & electrical engineers and Watermans as civil & structural engineers.

Key criteria
For water cleansing north of the border, Tubosider redesigned its own system of helibore steel tanks to meet the particularly high demands of the Scottish Environmental Protection Agency (SEPA).

Not only did the specification meet SEPA’s requirement for primary treatment by forcing feed water into a granular layer at a lower level. The technical designs ultimately developed with and approved by GRAHAM and Watermans also saved considerable cost by avoiding 33 manholes which the originally intended crate system would have involved.

Under the Tubosider system, water passes into the pipes of a total of five tanks and out through the joints into a 300mm backfill. It then passes through small diameter pipes and out into manholes, having been polished and cleaned by the stone bed before exiting.

Solution & benefits
Tubosider’s system, with a deeper bed than usual for its stormwater management systems, reproduces the natural method of cleaning water. The six-figure contract is a major win for Tubosider in Scotland and could pave the way for many more.

As GRAHAM’s project manager at Port Glasgow John Mitchell said, using a steel tank system in this way was a first: “The big challenge we faced was integrating the filter capacity within the design, but this was quickly expedited with Tubosider.

“Once the system had been design and prefabricated, handling and installation compared very well with other systems, based on robust components of minimal weight. Delivery, support and follow-up were equally good, on-time with quick responses to required timescales, informing us in advance of agreed supply dates plus the number of wagons expected.”

Important Notice

We have a temporary issue with our telephone landline. There is some sort of major outage due to a ‘network update’.
If you require sales assistance please contact the relevant regional member of our sales team via their mobile number or email found on our contact page

For production or delivery enquiries contact: 07464 481108 or production@tubosider.co.uk

For technical enquiries please contact: 07715 068150 or info@tubosider.co.uk

For other enquiries contact: 07715 068150 or info@tubosider.co.uk

Alternatively contact us via the Zendesk chat at the bottom of the screen.

Sorry for any inconvenience caused.

Please click anywhere on the screen to hide this message.